SunPower
Utility Patent Applications
Last updated:
List of all SunPower patents 156 in total
Status | Patent |
---|---|
Application | Utility: ENERGY FLOW PREDICTION FOR ELECTRIC SYSTEMS INCLUDING PHOTOVOLTAIC SOLAR SYSTEMS Filling date: 8 Sep 2025 Issue date: 30 Apr 2020 |
Application | Utility: STRUCTURES AND METHODS FOR FORMING ELECTRODES OF SOLAR CELLS Filling date: 8 Sep 2025 Issue date: 23 Apr 2020 |
Application | Utility: SYSTEMS AND APPARATUSES FOR CARPORT WITH INTEGRATED PRECIPITATION AND CABLE MANAGEMENT Filling date: 8 Sep 2025 Issue date: 16 Apr 2020 |
Application | Utility: MICROINVERTER SYSTEMS AND SUBSYSTEMS Filling date: 8 Sep 2025 Issue date: 16 Apr 2020 |
Application | Utility: TRI-LAYER SEMICONDUCTOR STACKS FOR PATTERNING FEATURES ON SOLAR CELLS Filling date: 8 Sep 2025 Issue date: 16 Apr 2020 |
Application | Utility: UV-CURING OF LIGHT-RECEIVING SURFACES OF SOLAR CELLS Filling date: 8 Sep 2025 Issue date: 9 Apr 2020 |
Application | Utility: SOLAR CELLS HAVING HYBRID ARCHITECTURES INCLUDING DIFFERENTIATED P-TYPE AND N-TYPE REGIONS Filling date: 8 Sep 2025 Issue date: 2 Apr 2020 |
Application | Utility: SOLAR CELL WITH WRAPAROUND FINGER Filling date: 8 Sep 2025 Issue date: 2 Apr 2020 |
Application | Utility: SYSTEMS AND METHOD FOR DETERMINING SOLAR PANEL PLACEMENT AND ENERGY OUTPUT Filling date: 8 Sep 2025 Issue date: 26 Mar 2020 |
Application | Utility: SOLAR MODULE SKIRT ASSEMBLY Filling date: 8 Sep 2025 Issue date: 26 Mar 2020 |
Application | Utility: SOLAR CELL HAVING AN EMITTER REGION WITH WIDE BANDGAP SEMICONDUCTOR MATERIAL Filling date: 8 Sep 2025 Issue date: 19 Mar 2020 |
Application | Utility: LASER BEAM SHAPING FOR FOIL-BASED METALLIZATION OF SOLAR CELLS Filling date: 8 Sep 2025 Issue date: 19 Mar 2020 |
Application | Utility: SOLAR CELL EMITTER REGION FABRICATION WITH DIFFERENTIATED P-TYPE AND N-TYPE REGION ARCHITECTURES Filling date: 8 Sep 2025 Issue date: 5 Mar 2020 |
Application | Utility: SOLAR ENERGY METERING, COMMUNICATIONS, AND CONTROL SYSTEM Filling date: 8 Sep 2025 Issue date: 27 Feb 2020 |
Application | Utility: BLISTER-FREE POLYCRYSTALLINE SILICON FOR SOLAR CELLS Filling date: 8 Sep 2025 Issue date: 27 Feb 2020 |
Application | Utility: FRONT CONTACT SOLAR CELL WITH FORMED ELECTRICALLY CONDUCTING LAYERS ON THE FRONT SIDE AND BACKSIDE Filling date: 8 Sep 2025 Issue date: 13 Feb 2020 |
Application | Utility: PHOTOVOLTAIC MODULES Filling date: 8 Sep 2025 Issue date: 30 Jan 2020 |
Application | Utility: SOLAR PANEL Filling date: 8 Sep 2025 Issue date: 26 Dec 2019 |
Application | Utility: FRONT CONTACT SOLAR CELL WITH FORMED EMITTER Filling date: 8 Sep 2025 Issue date: 26 Dec 2019 |
Application | Utility: SYSTEMS AND APPARATUSES FOR CARPORT WITH INTEGRATED PRECIPITATION AND CABLE MANAGEMENT Filling date: 8 Sep 2025 Issue date: 19 Dec 2019 |
Application | Utility: SYSTEMS AND APPARATUSES FOR PRECIPITATION MANAGEMENT IN SOLAR ASSEMBLIES Filling date: 8 Sep 2025 Issue date: 19 Dec 2019 |
Application | Utility: PHOTOVOLTAIC PANEL Filling date: 8 Sep 2025 Issue date: 19 Dec 2019 |
Application | Utility: PLASMA-CURING OF LIGHT-RECEIVING SURFACES OF SOLAR CELLS Filling date: 8 Sep 2025 Issue date: 19 Dec 2019 |
Application | Utility: TRENCH PROCESS AND STRUCTURE FOR BACKSIDE CONTACT SOLAR CELLS WITH POLYSILICON DOPED REGIONS Filling date: 8 Sep 2025 Issue date: 12 Dec 2019 |
Application | Utility: Commanding Distributed Energy Resources Filling date: 8 Sep 2025 Issue date: 5 Dec 2019 |
Application | Utility: CLAMPS FOR SOLAR SYSTEM Filling date: 8 Sep 2025 Issue date: 28 Nov 2019 |
Application | Utility: DIODE-INCLUDED CONNECTOR, PHOTOVOLTAIC LAMINATE AND PHOTOVOLTAIC ASSEMBLY USING SAME Filling date: 8 Sep 2025 Issue date: 28 Nov 2019 |
Application | Utility: METERING AND CONTROL SUBSYSTEMS FOR PHOTOVOLTAIC SOLAR SYSTEMS Filling date: 8 Sep 2025 Issue date: 28 Nov 2019 |
Application | Utility: RAPID SHUTDOWN OF PHOTOVOLTAIC SYSTEMS Filling date: 8 Sep 2025 Issue date: 7 Nov 2019 |
Application | Utility: CABLING SYSTEMS FOR ROOFTOP PHOTOVOLTAIC SOLAR SYSTEMS Filling date: 8 Sep 2025 Issue date: 7 Nov 2019 |
Application | Utility: SOLAR CELLS HAVING JUNCTIONS RETRACTED FROM CLEAVED EDGES Filling date: 8 Sep 2025 Issue date: 17 Oct 2019 |
Application | Utility: METHOD AND APPARATUS OF FABRICATING A SOLAR CELL DEVICE Filling date: 8 Sep 2025 Issue date: 17 Oct 2019 |
Application | Utility: LOCAL PATTERNING AND METALLIZATION OF SEMICONDUCTOR STRUCTURES USING A LASER BEAM Filling date: 8 Sep 2025 Issue date: 10 Oct 2019 |
Application | Utility: LASER ASSISTED METALLIZATION PROCESS FOR SOLAR CELL CIRCUIT FORMATION Filling date: 8 Sep 2025 Issue date: 10 Oct 2019 |
Application | Utility: LASER ASSISTED METALLIZATION PROCESS FOR SOLAR CELL STRINGING Filling date: 8 Sep 2025 Issue date: 10 Oct 2019 |
Application | Utility: RECONFIGURABLE PHOTOVOLTAIC LAMINATE(S) AND PHOTOVOLTAIC PANEL(S) Filling date: 8 Sep 2025 Issue date: 10 Oct 2019 |
Application | Utility: LASER ASSISTED METALLIZATION PROCESS FOR SOLAR CELL FABRICATION Filling date: 8 Sep 2025 Issue date: 10 Oct 2019 |
Application | Utility: LOCAL METALLIZATION FOR SEMICONDUCTOR SUBSTRATES USING A LASER BEAM Filling date: 8 Sep 2025 Issue date: 10 Oct 2019 |
Application | Utility: SYSTEMS FOR LASER ASSISTED METALLIZATION OF SUBSTRATES Filling date: 8 Sep 2025 Issue date: 10 Oct 2019 |
Application | Utility: PHOTOVOLTAIC MODULE WITH A CROSS RAIL ASSEMBLY Filling date: 8 Sep 2025 Issue date: 10 Oct 2019 |
Application | Utility: SOLAR DEVICE WITH INSULATED INTERCONNECTORS Filling date: 8 Sep 2025 Issue date: 10 Oct 2019 |
Application | Utility: MONITORING ELECTRIC SYSTEMS FOR WIRING FAULTS Filling date: 8 Sep 2025 Issue date: 10 Oct 2019 |
Application | Utility: FLEXIBLE LAMINATES FOR SOLAR MODULES Filling date: 8 Sep 2025 Issue date: 3 Oct 2019 |
Application | Utility: NON-PERMEABLE SUBSTRATE CARRIER FOR ELECTROPLATING Filling date: 8 Sep 2025 Issue date: 3 Oct 2019 |
Application | Utility: INTEGRATED EXTERNAL CONNECTORS Filling date: 8 Sep 2025 Issue date: 3 Oct 2019 |
Application | Utility: WIRE-BASED METALLIZATION AND STRINGING FOR SOLAR CELLS Filling date: 8 Sep 2025 Issue date: 3 Oct 2019 |
Application | Utility: SINGLE-WALLED CONNECTING KEY FRAMESETS Filling date: 8 Sep 2025 Issue date: 3 Oct 2019 |
Application | Utility: DUAL WAFER PLATING FIXTURE FOR A CONTINUOUS PLATING LINE Filling date: 8 Sep 2025 Issue date: 3 Oct 2019 |
Application | Utility: TORQUE TUBE COUPLER Filling date: 8 Sep 2025 Issue date: 12 Sep 2019 |
Application | Utility: PHOTONIC DEGRADATION MONITORING FOR SEMICONDUCTOR DEVICES Filling date: 8 Sep 2025 Issue date: 5 Sep 2019 |
Showing 100 to 150 of 156 patents.