Agilent Technologies, Inc.
Synchronization of Supply Flow Paths

Last updated:

Abstract:

A solvent supply system for supplying a composite includes a first supply path with a first pump unit, the first supply path being adapted for supplying a first solvent to a mixing unit, the first pump unit operating periodically, and a second supply path with a second pump unit, the second supply path being adapted for supplying a second solvent to the mixing unit, the second pump unit operating periodically. The mixing unit is adapted for mixing the first and the second solvent and for supplying a composite solvent. The solvent supply system further includes a control unit adapted for controlling operation of the first and the second pump unit.

Status:
Application
Type:

Utility

Filling date:

17 May 2021

Issue date:

21 Oct 2021