Autodesk, Inc.
GENERATING BUILDING DESIGNS THAT OPTIMIZE PRODUCTIVITY OF THE BUILDING

Last updated:

Abstract:

One embodiment sets forth a computer-implemented method for measuring productivity in buildings and workplaces. The method includes receiving workstation data for a plurality of workstations for the building and operation data for a plurality of operations for the building; generating a building layout specifying, for each workstation of the plurality of workstations, a respective location of the workstation; generating, for each operation of the plurality of operations, a respective productivity value based on the workstation data, the operation data, and the locations of the plurality of workstations; and calculating, based on the productivity values of the plurality of operations, one or more overall productivity values associated with the building layout.

Status:
Application
Type:

Utility

Filling date:

13 Nov 2020

Issue date:

20 May 2021