Applied Materials, Inc.
Method for improving semiconductor back-end factories

Last updated:

Abstract:

Embodiments presented herein provide techniques for planning and scheduling a semiconductor back end factory. The technique begins by running a first mathematical programing model applied to factory data and production targets that produces a solution and processing the solution to produce a bottleneck loading plan for at least one machine of the factory's bottleneck machine families. The technique further includes running a second mathematical programing model applied to the bottleneck loading plan that produces a solution and processing the solution to produce a conversion schedule for the at least one machine of the bottleneck machine families. The technique further includes creating a lot schedule for the factory by running a simulation that follows the conversion schedule. The technique further includes publishing the lot schedule.

Status:
Grant
Type:

Utility

Filling date:

10 May 2018

Issue date:

24 Aug 2021