Applied Materials, Inc.
Methods and systems for applying run-to-run control and virtual metrology to reduce equipment recovery time
Last updated:
Abstract:
Described herein are methods, apparatuses, and systems for reducing equipment repair time. Disclosed methods include collecting data including test substrate data or other metrology data and fault detection data for maintenance recovery of at least one manufacturing tool in a manufacturing facility. Disclosed methods include determining a relationship between tool parameter settings for the at least one manufacturing tool and at least some collected data including the test substrate data. The disclosure includes utilizing virtual metrology predictive algorithms and at least some collected data to obtain a metrology prediction and applying multivariate run-to-run (R2R) control modeling to obtain a tool parameter adjustment for at least one target parameter for the at least one manufacturing tool. The disclosure further includes applying the R2R control modeling to obtain tool parameter adjustments for at least one manufacturing tool.
Utility
12 Aug 2019
1 Jun 2021