Advanced Micro Devices
Utility Patents
Last updated:
List of all Advanced Micro Devices patents 644 in total
Status | Patent |
---|---|
Grant | Utility: Argmax use for machine learning Filling date: 12 Sep 2025 Issue date: 22 Mar 2022 |
Grant | Utility: Dynamic banking and bit separation in memories Filling date: 12 Sep 2025 Issue date: 22 Mar 2022 |
Grant | Utility: Register renaming after a non-pickable scheduler queue Filling date: 12 Sep 2025 Issue date: 22 Mar 2022 |
Grant | Utility: Trusted memory zone Filling date: 12 Sep 2025 Issue date: 22 Mar 2022 |
Grant | Utility: Task graph generation for workload processing Filling date: 12 Sep 2025 Issue date: 15 Mar 2022 |
Grant | Utility: Mechanism for throttling untrusted interconnect agents Filling date: 12 Sep 2025 Issue date: 15 Mar 2022 |
Grant | Utility: Method for matrix data broadcast in parallel processing Filling date: 12 Sep 2025 Issue date: 15 Mar 2022 |
Grant | Utility: Transfer of cachelines in a processing system based on transfer costs Filling date: 12 Sep 2025 Issue date: 15 Mar 2022 |
Grant | Utility: Multi-sensor location data tracking Filling date: 12 Sep 2025 Issue date: 15 Mar 2022 |
Grant | Utility: Integration of variable rate shading and super-sample shading Filling date: 12 Sep 2025 Issue date: 15 Mar 2022 |
Grant | Utility: Merged data path for triangle and box intersection test in ray tracing Filling date: 12 Sep 2025 Issue date: 15 Mar 2022 |
Grant | Utility: Sorting instances of input data for processing through a neural network Filling date: 12 Sep 2025 Issue date: 15 Mar 2022 |
Grant | Utility: Broadcast command and response Filling date: 12 Sep 2025 Issue date: 15 Mar 2022 |
Grant | Utility: Power management advisor to support power management control Filling date: 12 Sep 2025 Issue date: 15 Mar 2022 |
Grant | Utility: Enforcing central processing unit quality of service guarantees when servicing accelerator requests Filling date: 12 Sep 2025 Issue date: 15 Mar 2022 |
Grant | Utility: Circuit board with bridge chiplets Filling date: 12 Sep 2025 Issue date: 15 Mar 2022 |
Grant | Utility: Reference free and temperature independent voltage-to-digital converter Filling date: 12 Sep 2025 Issue date: 1 Mar 2022 |
Grant | Utility: Integrated circuit memory with built-in self-test (BIST) Filling date: 12 Sep 2025 Issue date: 1 Mar 2022 |
Grant | Utility: Voltage regulation system for memory bit cells Filling date: 12 Sep 2025 Issue date: 1 Mar 2022 |
Grant | Utility: Command throughput in PIM-enabled memory using available data bus bandwidth Filling date: 12 Sep 2025 Issue date: 1 Mar 2022 |
Grant | Utility: Automatic memory overclocking Filling date: 12 Sep 2025 Issue date: 1 Mar 2022 |
Grant | Utility: Workload-based clock adjustment at a processing unit Filling date: 12 Sep 2025 Issue date: 1 Mar 2022 |
Grant | Utility: Automatic generation of efficient vector code with low overhead in a time-efficient manner independent of vector width Filling date: 12 Sep 2025 Issue date: 1 Mar 2022 |
Grant | Utility: Using loop exit prediction to accelerate or suppress loop mode of a processor Filling date: 12 Sep 2025 Issue date: 22 Feb 2022 |
Grant | Utility: Data output rate with variable rate shading Filling date: 12 Sep 2025 Issue date: 22 Feb 2022 |
Grant | Utility: Loader and runtime operations for heterogeneous code objects Filling date: 12 Sep 2025 Issue date: 22 Feb 2022 |
Grant | Utility: Exploiting camera depth information for video encoding Filling date: 12 Sep 2025 Issue date: 15 Feb 2022 |
Grant | Utility: Performance for GPU exceptions Filling date: 12 Sep 2025 Issue date: 15 Feb 2022 |
Grant | Utility: System and method for scheduling instructions in a multithread SIMD architecture with a fixed number of registers Filling date: 12 Sep 2025 Issue date: 8 Feb 2022 |
Grant | Utility: Adaptive world switching Filling date: 12 Sep 2025 Issue date: 8 Feb 2022 |
Grant | Utility: Multi-version shaders Filling date: 12 Sep 2025 Issue date: 8 Feb 2022 |
Grant | Utility: Control flow guided lock address prefetch and filtering Filling date: 12 Sep 2025 Issue date: 8 Feb 2022 |
Grant | Utility: Early culling for ray tracing Filling date: 12 Sep 2025 Issue date: 1 Feb 2022 |
Grant | Utility: Method for a reliability, availability, and serviceability-conscious huge page support Filling date: 12 Sep 2025 Issue date: 1 Feb 2022 |
Grant | Utility: Arithemetic logic unit register sequencing Filling date: 12 Sep 2025 Issue date: 1 Feb 2022 |
Grant | Utility: Linear, low-latency power supply monitor Filling date: 12 Sep 2025 Issue date: 1 Feb 2022 |
Grant | Utility: Method and apparatus for controlling cache line storage in cache memory Filling date: 12 Sep 2025 Issue date: 1 Feb 2022 |
Grant | Utility: Data flow in a distributed graphics processing unit architecture Filling date: 12 Sep 2025 Issue date: 25 Jan 2022 |
Grant | Utility: Methods and devices for testing multiple memory configurations Filling date: 12 Sep 2025 Issue date: 25 Jan 2022 |
Grant | Utility: Mechanism for mitigating information leak via cache side channels during speculative execution Filling date: 12 Sep 2025 Issue date: 25 Jan 2022 |
Grant | Utility: Cache for storing regions of data Filling date: 12 Sep 2025 Issue date: 25 Jan 2022 |
Grant | Utility: In memory logic functions using memory arrays Filling date: 12 Sep 2025 Issue date: 25 Jan 2022 |
Grant | Utility: Heterogeneous parallel primitives programming model Filling date: 12 Sep 2025 Issue date: 25 Jan 2022 |
Grant | Utility: Using a bloom filter to reduce the number of memory addressees tracked by a coherence directory Filling date: 12 Sep 2025 Issue date: 18 Jan 2022 |
Grant | Utility: Static random access memory read path with latch Filling date: 12 Sep 2025 Issue date: 18 Jan 2022 |
Grant | Utility: Selective prefetching in multithreaded processing units Filling date: 12 Sep 2025 Issue date: 18 Jan 2022 |
Grant | Utility: Memory bandwidth reduction techniques for low power convolutional neural network inference applications Filling date: 12 Sep 2025 Issue date: 18 Jan 2022 |
Grant | Utility: Refresh management for DRAM Filling date: 12 Sep 2025 Issue date: 11 Jan 2022 |
Grant | Utility: Re-purposing byte enables as clock enables for power savings Filling date: 12 Sep 2025 Issue date: 11 Jan 2022 |
Grant | Utility: Error handling for resilient software Filling date: 12 Sep 2025 Issue date: 11 Jan 2022 |
Showing 100 to 150 of 644 patents.