BAE Systems PLC
LOAD CONTROLLER

Last updated:

Abstract:

There is provided a load controller for a system, the system comprising a first sub-system arranged to deliver a first load, the load controller being operable to: acquire a first target load profile, being the load initially desired for delivery by the first sub-system over an operational period; measure in real time during an update window within the operational period: a first parameter of the first sub-system, to obtain a first measured Load Controller monitor signal; and the first load, to obtain a first measured load signal; develop in real time a model of the first sub-system, using the first measured monitor signal and the first measured load signal, the model relating the first load to the first parameter; given the first target load profile, and the model of the first sub-system, generate for a future period a first predicted monitor signal, the future period being ahead of the update window; and determine whether the first predicted monitor signal satisfies at least one predetermined criterion.

Status:
Application
Type:

Utility

Filling date:

27 Jun 2019

Issue date:

10 Jun 2021