The Boeing Company
Aircraft maintenance program bridging systems and methods

Last updated:

Abstract:

An aircraft maintenance bridging system and method are configured to determine at least one transition option that transitions one or more aircraft from a current maintenance program schedule to a new maintenance program schedule. The aircraft maintenance bridging method includes analyzing the current maintenance program schedule and the new maintenance program schedule with a maintenance bridging determination control unit, and determining the transition option(s), using the maintenance bridging determination control unit, for the aircraft based on analyzing the current maintenance program schedule and the new maintenance program schedule.

Status:
Grant
Type:

Utility

Filling date:

6 Oct 2016

Issue date:

1 Dec 2020