The Boeing Company
Overhead payload module with integrated stowbins

Last updated:

Abstract:

In an example, an overhead payload module is described. The overhead payload module comprises a ceiling assembly, an aisle floor assembly, a first payload assembly attached to the ceiling assembly and the aisle floor assembly to form a first side of the overhead payload module, and a second payload assembly attached to the ceiling assembly and the aisle floor assembly to form a second side of the overhead payload module. The first payload assembly comprises a first payload module and a first overhead stowbin module structurally integrated with the first payload module and having a first stowage area configured to receive stowbins. The second payload assembly is positioned opposite the first payload assembly to form an aisle therebetween and comprises a second payload module and a second overhead stowbin module structurally integrated with the second payload module and having a second stowage area configured to receive stowbins.

Status:
Grant
Type:

Utility

Filling date:

18 Sep 2018

Issue date:

1 Dec 2020