Bloom Energy Corporation
Selective grounding of grid parallel inverter systems

Last updated:

Abstract:

A method of operating a power generator having a first electrical output electrically connected to a utility grid and a second electrical output electrically connected to a load includes detecting if the first electrical output of the power generator is electrically disconnected from the utility grid, and electrically connecting at least a neutral line of the first electrical output to ground in response to detecting that the first output is electrically disconnected from the utility grid.

Status:
Grant
Type:

Utility

Filling date:

17 Jan 2019

Issue date:

8 Mar 2022