Caterpillar Inc.
Method for optimizing mining production

Last updated:

Abstract:

A system for mining site production planning includes a control system configured to specify a problem-solving technique and associated optimization problem for a mining site by setting production goals and priorities for each of loading tools, processors, production arcs, and materials of the mining site, sorting the production arcs in an order based on travel distances, modifying the order based on the production goals for each of the loading tools, processors, production arcs, and/or materials, and further modifying the order based on set priorities for the loading tools, processors, production arcs, and/or materials. In addition, target values are set for each of the loading tools, processors, and production arcs according to their order of the sorted production arcs. The control system is further configured to solve the optimization problem to produce production values for each of the loading tools, processors, and production arcs based on the target values.

Status:
Grant
Type:

Utility

Filling date:

3 Jul 2018

Issue date:

4 May 2021