Caterpillar Inc.
Generator control systems and methods
Last updated:
Abstract:
A method of operating a plurality of power sources is provided. The method includes operating a first power source at a first power output and operating a second power source at a second power output. The second power source has a second operational capacity greater than the first operational capacity. First transient zone parameters are determined to operate in a first transient output power range. The first transient zone parameters include a first planned power output and a second planned power output constrained to be less than the first operational capacity.
Status:
Grant
Type:
Utility
Filling date:
5 Sep 2019
Issue date:
19 Jul 2022