ConocoPhillips
Blowdown pressure maintenance with foam

Last updated:

Abstract:

A method and system in which foams are used (instead of, or in addition to, NCG) to maintain pressure in a mature chamber during blowdown operations of a SAGD process or other enhanced oil recovery process. The foam occupies the depleted void space within the mature chamber after injection ceases, maintaining pressure, and improving blowdown performance. This use of the foam in the method and system also improves the performance of less mature chambers that are being operated at higher pressure adjacent to the mature chamber in blowdown. Foaming agents, such as metal carbonates, bicarbonates, and hydroxides, surfactants or any other colloidal foams, aerosols, hydrosols, emulsions or dispersions can be utilized. The method and system can be utilized in conjunction with other known art, such as heat scavenging in the chamber, or enhanced oil recovery utilizing foams, to displace oil in the chamber.

Status:
Grant
Type:

Utility

Filling date:

16 Jun 2017

Issue date:

12 Nov 2019