Cisco Systems, Inc.
Link fault handling in fronthaul communication networks

Last updated:

Abstract:

In a fronthaul network system, when a CPRI link fault is detected at either of the REC or RE, both the REC and RE perform a Layer 1 synchronization. The fault may be a loss of signal, loss of frame, or a line code violation, which also translates to a loss of signal if seen beyond a threshold. A proxy slave recognizes the fault in a CPRI signal from a first radio device and inserts the fault alarm into a header of a radio over Ethernet frame. The proxy slave continues to communicate the signal for a configured number of hyper-frames. A proxy master receives the signal and communicates the signal and the fault alarm to a receiving radio device for a configured number of hyper-frames. The proxy and radio devices all perform a joint resynchronization.

Status:
Grant
Type:

Utility

Filling date:

16 Aug 2019

Issue date:

21 Dec 2021