Deere & Company
Accumulator pre-charge determination

Last updated:

Abstract:

An exemplary method generally includes charging hydraulic fluid into or out of a cavity of an accumulator at a controlled flowrate, detecting movement of a machine component from a first position toward a second position, determining an idle time spanning from a start of the charging to detection of the movement of the machine component, and determining a pre-charge of the accumulator based upon the idle time and a flowrate value of the controlled flowrate.

Status:
Grant
Type:

Utility

Filling date:

11 Jan 2021

Issue date:

14 Sep 2021