Energy Recovery, Inc.
System for using pressure exchanger in mud pumping application

Last updated:

Abstract:

A system includes a pump configured to pressurize a first fluid, and a pressure exchanger (PX). The PX is configured to receive a second fluid, to receive the pressurized first fluid, and to utilize the pressurized first fluid to pressurize the drilling mud for transport to a well.

Status:
Grant
Type:

Utility

Filling date:

2 Oct 2017

Issue date:

4 May 2021