General Electric Company
Movable wall for additive powder bed

Last updated:

Abstract:

An additive manufacturing apparatus for building an object is provided. The apparatus includes a build chamber having at least one chamber wall, a powder delivery mechanism, and a build platform. The build chamber and build platform defines while in operation a powder bed. At least one surface of the build chamber or build platform is moveable in a manner that is capable of adjusting forces on the object in the powder bed.

Status:
Grant
Type:

Utility

Filling date:

17 Aug 2017

Issue date:

10 Aug 2021