General Electric Company
EXTREMELY FAST SUBSTATION ASSET MONITORING SYSTEM AND METHOD
Last updated:
Abstract:
embodiments are directed to a system, method, and article for monitoring a power substation asset. During an offline analysis mode, training data may be acquired and processing, and one or more classifiers may be generated for an online anomaly detection and localization mode. During the online anomaly detection and localization mode, power system related data may be received from field devices, a state of a substation system and of the power substation asset component and an unclassified state of one or instances may be generated based on the one or more classifiers. An alert may be generated to indicate the state of the substation system and of the power substation asset.
Status:
Application
Type:
Utility
Filling date:
6 Sep 2019
Issue date:
17 Sep 2020