General Electric Company
System and method for gas turbine compressor cleaning

Last updated:

Abstract:

In one embodiment, a method includes sensing first operations for one or more turbine systems in a fleet of turbine systems via a plurality of sensors disposed in the one or more turbine systems before a first wash operation. The method further includes sensing second operations for the one or more turbine systems via the one or more sensors after the water wash operation. The method also includes deriving at least one forecasting model based on the sensing first operations and the sensing second operations, wherein the at least one forecasting model is configured to predict a performance of a turbine system of the one or more turbine systems. The method additionally includes applying the at least one forecasting model to derive a predictive improvement in the performance for the turbine system.

Status:
Grant
Type:

Utility

Filling date:

17 Aug 2016

Issue date:

12 Oct 2021