General Electric Company
System and method for controlling a wind farm

Last updated:

Abstract:

A system and method are provided for controlling a wind farm. Accordingly, a demand signal is received from the electrical grid. The farm-level controller also receives a plurality of capability metrics from each wind turbines, which include, at least, a steady-state power availability, a transient power availability and a responsive capability of each wind turbine. The farm-level controller determines a power production capability profile for each wind turbine and determines the availability of each wind turbine to meet at least a portion of the demand signal based on the power production capability profiles. The farm-level controller also determines which portion of the demand signal to be satisfied by each wind turbine based on the availability and the power production capability for each wind turbine.

Status:
Grant
Type:

Utility

Filling date:

15 Nov 2019

Issue date:

27 Apr 2021