General Electric Company
Determining compliance of a target asset to at least one defined parameter based on a simulated transient response capability of the target asset and as a function of physical operation data measured during an actual defined event

Last updated:

Abstract:

Distribution network response capability monitoring and compliance determination is provided herein. A method can comprise generating, by a system comprising a processor, a model of a target asset based on operation data measured at the target asset during a defined event. The model is configured to simulate a transient response capability of the target asset. The method can also comprise determining, by the system, a compliance of the target asset to at least one defined parameter based on the transient response capability of the target asset during a simulated event and as a function of the operation data measured during the defined event.

Status:
Grant
Type:

Utility

Filling date:

26 May 2017

Issue date:

16 Feb 2021