General Electric Company
Cluster-based decision boundaries for threat detection in industrial asset control system

Last updated:

Abstract:

A threat detection model creation computer may receive a series of monitoring node values (representing normal and/or threatened operation of the industrial asset control system) and generate a set of normal feature vectors. The threat detection model creation computer may identify a first cluster and a second cluster in the set of feature vectors. The threat detection model creation computer may then automatically determine a plurality of cluster-based decision boundaries for a threat detection model. A first potential cluster-based decision boundary for the threat detection model may be automatically calculated based on the first cluster in the set of feature vectors. Similarly, the threat detection model creation computer may also automatically calculate a second potential cluster-based decision boundary for the threat detection model based on the second cluster in the set of feature vectors.

Status:
Grant
Type:

Utility

Filling date:

3 Jan 2017

Issue date:

13 Oct 2020