General Electric Company
Apparatus and method for event detection and duration determination

Last updated:

Abstract:

An asset class type of a new asset is predicted or determined based upon an evaluation of time series data from the new asset. A predicted asset type is used to identify sensors of the new asset to use for data collection. Using the readings of selected sensors from the new asset, states of the new asset are obtained. The duration at least one of these states of the new asset is determined. This information can be subsequently used to optimize the performance of the new asset.

Status:
Grant
Type:

Utility

Filling date:

22 Jan 2018

Issue date:

11 Aug 2020