Method for shutdown of an active neutral point clamped converter
Last updated:
Abstract:
A method for shutting down a phase-leg of a three-level active neutral point clamped converter is provided. The method includes the following steps. A determining step determines if a switch fault has occurred, and if a switch fault has occurred then each switch of the plurality of switches are turned off. If a switch fault has not occurred and a shutdown is requested, then an operating step operates the plurality of switches to turn off a first switch and a fourth switch. A waiting step waits for a first predetermined time period. An operating step operates the plurality of switches to turn on a second switch and a third switch. A waiting step is repeated. An operating step operates the plurality of switches to turn off a fifth switch and a sixth switch. A waiting step is repeated. An operating step turns off the second switch and the third switch.