General Electric Company
Cumulative cost model for predicting asset maintenance cost from distress models

Last updated:

Abstract:

Distress models can be generated to model current or future deterioration of components. By correlating distress models with maintenance costs and material consumption, cumulative cost models and cumulative material models can be developed to optimize engine removal timing in order to maximize asset and portfolio value.

Status:
Grant
Type:

Utility

Filling date:

12 Aug 2020

Issue date:

25 Jan 2022