General Electric Company
Systems and methods for generating maintenance packages

Last updated:

Abstract:

A power plant system includes a turbine system, a sensor, and a controller. The sensor is configured to collect a first set of data regarding the turbine system. The controller is configured to receive user input regarding constraints of the turbine system, a second set of data regarding the power plant system, and the first set of data. The controller is configured to determine whether a first notification is present based on a determined status and to generate a first maintenance package based on the first notification, life odometer solutions, condition monitoring solutions, and the first set of data. The controller is configured to generate a model of implementing the first maintenance package with respect to the turbine system as well as to generate a second maintenance package based on the user input, the second set of data, the first maintenance package, and the scenario model.

Status:
Grant
Type:

Utility

Filling date:

16 Dec 2016

Issue date:

8 Oct 2019