General Electric Company
System and method for assessing the performance impact of wind turbine upgrades

Last updated:

Abstract:

In one aspect, a method for assessing the performance impact of wind turbine upgrades may generally include determining a baseline power curve for a wind turbine prior to the wind turbine being upgraded and determining a baseline wind speed transfer function for the wind turbine prior to the wind turbine being upgraded. The method may also include determining an upgraded wind speed transfer function for the wind turbine after the wind turbine is upgraded. In addition, the method may include determining a corrected local wind speed for the wind turbine based on the baseline and upgraded wind speed transfer functions and determining an upgraded power curve for the wind turbine based on the corrected local wind speed.

Status:
Grant
Type:

Utility

Filling date:

19 Nov 2014

Issue date:

27 Aug 2019