General Electric Company
Model for predicting distress on a component

Last updated:

Abstract:

An apparatus and method for predicting distress on a physical component. The method can include obtaining distress data. The distress data can be used to determine a distress rank. The distress rank can be compared to a distress output provided by a kernel that use parameters related to the physical component. The comparison can result in a prediction model for the physical component.

Status:
Grant
Type:

Utility

Filling date:

26 Dec 2018

Issue date:

22 Feb 2022