General Electric Company
THRUST MOUNTS WITH LOAD-BALANCING THRUST LINK-LEVER

Last updated:

Abstract:

A thrust mount assembly includes a thrust link-lever that has a first end region, a second end region, and a fulcrum region disposed between the first end region and the second end region. A thrust link-lever may be coupled or couplable to a fulcrum body of an aft engine-mount at a fulcrum position of the thrust link-lever. When coupled to a turbomachine, the fulcrum position of the thrust link-lever may be laterally offset and/or laterally adjustable relative to an axis of rotation of the turbomachine. A load translated from an engine frame of a turbomachine to an engine-mounting linkage system may be determined and a fulcrum position for the thrust mount assembly may be adjusted laterally relative to an axis of rotation of the turbomachine.

Status:
Application
Type:

Utility

Filling date:

8 Sep 2020

Issue date:

24 Feb 2022