General Electric Company
SYSTEM AND METHOD FOR IMPROVING STARTUP TIME IN A FOSSIL-FUELED POWER GENERATION SYSTEM

Last updated:

Abstract:

A system for reheating a power generation system including a boiler having a waterwall and a steam drum with an input fluidly coupled to the waterwall and an auxiliary heat source to provide heated fluid. The system also includes a first flow control valve connected to the auxiliary heat source and the boiler to control a flow of heated fluid from the auxiliary heat source to the waterwall; a first isolation valve disposed at a waterwall, to isolate circulation of heated fluid from the steam drum to the waterwall; and a sensor to monitor at least one operating characteristic in the boiler. The system also includes a controller to control at least one of the flow control valve, the isolation valve, and the auxiliary heat source to control the amount of heated fluid supplied to the waterwall when the boiler is not generating steam.

Status:
Application
Type:

Utility

Filling date:

7 Jan 2021

Issue date:

7 Jul 2022