Corning Incorporated
MULTI-SHOWERHEAD CHEMICAL VAPOR DEPOSITION REACTOR, PROCESS AND PRODUCTS

Last updated:

Abstract:

A method of forming a kilometer(s)-length high temperature superconductor tape by feeding a textured tape from roll-to-roll through a reactor chamber, flowing high temperature superconductor precursors from an elongated precursor showerhead positioned in the chamber the elongation in a direction along the tape; flowing gas from first and second elongated gas curtain shower heads on either side of the precursor showerhead; and illuminating the upper surface of the tape with illumination from sources on opposing sides of the reactor, the illumination sources positioned so as to allow illumination to pass under a respective one of the curtain shower heads and under the precursor showerhead to the upper surface of the tape.

Status:
Application
Type:

Utility

Filling date:

25 Feb 2020

Issue date:

3 Feb 2022