Honeywell International Inc.
Bleed air compensated continuous power assurance analysis system and method
Last updated:
Abstract:
A system and method for providing bleed air compensation for a continuous power assurance analysis of a gas turbine engine includes estimating bleed air flow rate from the gas turbine engine, estimating a shift in power turbine inlet temperature based on the estimated bleed air flow rate, and applying the estimated shift in power turbine inlet temperature to the continuous power assurance analysis of the gas turbine engine.
Status:
Grant
Type:
Utility
Filling date:
30 Jan 2018
Issue date:
10 Aug 2021