International Business Machines Corporation
Latency management by edge analytics in industrial production environments

Last updated:

Abstract:

A method, computer program product, and computer system are disclosed. The method includes determining probability of high data flow event, memory requirements for the high data flow and time to high data flow event by using pattern recognition based on natural language Processing (NLP), machine learning and statistical algorithms. The method applies a configuration to the edge device and network system when the probability of high data flow event is above a predetermined threshold for handling the high data flow event.

Status:
Grant
Type:

Utility

Filling date:

16 Oct 2017

Issue date:

19 Oct 2021