International Business Machines Corporation
Managing tree risk

Last updated:

Abstract:

A method, a computer program product, and a computer system manage tree risk. The method includes receiving images corresponding to a geographic area. The method includes determining whether a first tree captured in at least one of the images has a condition exhibiting a tree risk that poses a hazard above an acceptable threshold. As a result of the first tree having the condition above the acceptable threshold, the method includes generating a notification identifying the first tree and a location of the first tree. The method includes transmitting the notification to a team equipped to remediate the condition of the first tree.

Status:
Grant
Type:

Utility

Filling date:

29 Jul 2019

Issue date:

8 Feb 2022