Intel Corporation
Infrastructure element state model and prediction

Last updated:

Abstract:

Herein is disclosed an infrastructure state prediction device comprising a memory device onto which an infrastructure state model corresponding to a location and a state timing of a plurality of infrastructure elements is stored; one or more processors, communicatively coupled to the memory device and configured to receive measurement information representing a location and an observed state of a first infrastructure element; determine a predicted state of a second infrastructure element based on a state timing corresponding to a second infrastructure element; determine a movement information based on the observed state of the first infrastructure element, the predicted state of the second infrastructure element and a relation between the location of the first infrastructure element and a location of the second infrastructure element; and generate a message comprising the movement information.

Status:
Grant
Type:

Utility

Filling date:

27 Dec 2018

Issue date:

10 Aug 2021