    Good day ladies and gentlemen and welcome to the Lightbridge Corporation 2012 and fourth quarter business update and financial results call. At this time all participants will be in listen-only mode. (Operator Instructions). I would now to introduce your host for today's conference Gary Sharpe, Head of Investor Relations.
  • Gary Sharpe:
    Thanks Bethany. Good morning ladies and gentlemen and welcome to the Lightbridge 2012 business update. By now, you should have received our earnings and update news release which was distributed after the market closed yesterday. You can view that on the investor relations page at Lightbridge website at ltbridge.com. Seth Grae, President and Chief Executive Officer will lead today’s call and in addition, the following executives are available to answer your questions. Jim Guerra, our Chief Operating Officer and CFO; Jim Malone, the company’s Chief Nuclear Fuel Development Officer; and Andrey Mushakov, Lightbridge’s Executive Vice President for International Nuclear Operations. Before Seth begins, let me remind you that today’s presentation includes forward-looking statements about the company's competitive position and product and service offerings. During the course of today’s call, words such as expect, anticipate, believe and intend will be used in our discussion of goals or events in the future. These statements are based on our current expectations and involve certain risks and uncertainties that may cause actual results to differ significantly from such estimates. The risks include that are not limited to the degree of market adoption of the company’s product and services offerings, market competition, dependence on strategic partners and the company’s ability to manage its business effectively in a rapidly evolving market. Certain of these and other risks are set forth in more detail in Lightbridge’s filings with the Securities and Exchange Commission. The company does not assume any obligation to update or revise these forward-looking statements whether as the result of new development or otherwise. You can participate in today's call two ways. First, you can submit questions for management in writing to ir@ltbridge.com. We’ll read your questions aloud and senior management will answer them. If you have already submitted a question, thank you. If not or if you have more questions, you can submit them at any time during the prepared remarks or doing the Q&A period. Next, after the prepared remarks, we'll open the lines for live questions. Telephone numbers and other details were distributed in two news releases that are posted on the Lightbridge Investor Relations website. Now, here is Seth Grae, President and Chief Executive Officer of Lightbridge.
  • Seth Grae:
    Thank you Gary. Good morning everyone. And thank you for joining our conference call for our 2012 business update. Lightbridge advanced strategically and tactically on every business front in 2012. We believe the stage is set for continued achievement in 2013 because of the compelling value of our patented fuel technology and growing demand for the proven expertise of our consulting services. Lightbridge is well positioned as global recognition increases of nuclear energy as a source of long-term, efficient, base-load and carbon-free electric power. In our fuel technology business segment, achievement of strategic and technical milestones in 2012, support the momentum behind commercialization of Lightbridge's next generation fuel design. We summarized the company's progress in a news release that was distributed yesterday. We are most encouraged by two independent and respected third parties that validate the benefit of the company' fuel technology. First, a study by Siemens Industry Inc. a whole owned subsidiary of Siemens showed that our metallic fuel for 10% operate and a 24 month fuel cycle at existing pressurized water reactors can deliver highly attractive returns on invested capital to nuclear utilities even with conservative assumption on reactor conversion and regulatory licensing costs. Next, a peer reviewed article in the company's fuel technology was also published in December 2012 in the prestigious Nuclear Technology. The article highlights how our fuel is capable of increasing the power output and extending the cycle length of current generation light water reactors. The paper also reviews the unique geometry and composition of our metallic fuel and its application to power upgrades in light water reactors. Submitted in 2011, the paper was subject to rigorous peer review by top technical experts before publication this December. The company also made significant progress on key technical milestones related to upcoming tests and demonstrations of our fuel rod samples in test reactors in the US and in Russia. Further, Lightbridge strengthened its extensive intellectual property portfolio in 2011 with patent grants or extensions on the company's fuel technology in Eurasia, Ukraine and the United States. In addition, national and international patent applications under the patent's corporation treaty were submitted for Lightbridge fuel technologies that once granted, will extent patent protection for these fuel designs to 2028 to 2031. In Lightbridge's advisory services business segment, we submitted numerous consulting proposals in 2012 to governmental entities in countries that want to establish nuclear energy programs. In addition, Lightbridge's consulting contract with the Nuclear Regulatory Authority in the United Arab Emirates was renewed in 2012 and extended till the end of 2014. In many of these consulting proposals, Lightbridge's team with large engineering and construction companies. Lightbridge adds value as a highly regarded expert resource for nuclear reactors site selection, procurement and deployment, reactor in fuel technology and international relations and regulatory affairs. We believe the company is well position to earn more of this type of long term high margin consulting business. However, review processes for these complex multimillion dollar contract are long and differ in every country, responses on our proposals are expected in mid-2013. The success of Lightbridge's advisory services division speaks for itself. Beginning in 2008, our expert structured a program for entities within the United Arab Emirate, construction of a $40 billion, four reactor project is underway in the United Arab Emirates and remains on time and on budget. In fact, it was just in the news this morning that the application was filed for approval for construction of units three and four of that program. Now let`s move on to the company's financial performance. Our financial results were summarized in the news release that was distributed after the market closed yesterday. In addition, our Form 10-K was filed with the SEC last night. Results for the quarter and year were also potted on the Lightbridge website. I won't recite all of the details now, except to report that at December 31st, 2012, Lightbridge had $4.4 million in cash and cash equivalents, restricted cash and marketable securities. Working capital totaled $5.1 million with no long term debt. The company has never incurred any long term debt in its history. We expect to seek new financing or additional sources of capital in the next six months to support the remaining R&D activities, prior to advance Lightbridge fuel products to a commercial stage. There are three primary potential sources of cash available to us. One, equity investments by institutional investors. To facilitate that option, Lightbridge intends to soon file the SEC, its updated shelf registration document. We regard shelf of one of the benefits of being listed on the NASDAQ exchange and it is a good cost efficient way to ensure the company's financial flexibility. We would carefully consider the dilutive effect of a potential equity raise as compared to the enhanced benefit of a balance sheet strength and liquidity needed to support the remaining R&D activities required to advance Lightbridge's fuel technology to a commercial stage. Two, strategic investment. Our fuel development cost sharing through alliances with major fuel vendors, fuel fabricators and other large strategic parties. We began discussions in 2012 with potential partners relating to US based fabrication which we believe could streamline productions of Lightbridge fuel and enhanced access to a major segment of the fuel's addressable market. We expect these discussions to be completed later this year. And three, new consulting contract. As I mentioned earlier, Lightbridge submitted advisory services proposal to several countries, mostly in the US and the Middle East where there are plans to create or expand electricity generation using nuclear power plant. Responses are expected beginning in mid-2013. Let`s shift gears and discuss a few recurring questions that are asked at industry events and investor conferences. Today, March, 1st is the day when congress mandated across the board spending reductions to take effect. Speculation about the impact of these spending cuts has dominated political and financial news for weeks. In short we believe that Lightbridge is relatively insulated from these budget cuts. Here is why. Since there is currently no official guidance on how sequestration will be implemented, it is possible that planned irradiation programs at the advanced test reactor at Idaho National Laboratory could be reduced by sequestration. At the same time, our primary plan has always been to conduct a Lupe radiation testing in the MIR research reactor in Russia. That can provide operating conditions most (inaudible) of the those in commercial pressurized water reactors. Since Lightbridge intends to fund the MIR irradiation testing, the sequester would have no impact on that program. No impact at all on that program. As such, if our planned irradiation program at the advanced test reactor were adversely impacted, we would still have access to the MIR research reactor to achieve our radiation program objectives. Other frequently asked questions center on the ongoing impact of nuclear power construction from one of the current glut of domestic natural gas, two, the Fukushima reactor accident on March, 11, 2011 and three, competition from solar, wind and other renewable energy sources. Let`s start with renewable energy competition. Online generation from nuclear energy and fossil fuels, solar and wind power cannot be relied on to generate base load electricity. Reliability is a key attribute of commercial nuclear power. According to the nuclear energy institute data, US nuclear energy facilities generate electricity 24/7 at an 89% capacity factor that is more efficient than other types of energy, coal fired with a 61%, capacity factor combined cycle natural gas at 46% and wind only at 32%. Nuclear energy is also less expensive and powered from renewable sources which are subsidized heavily by government. We discussed this contrast in the Lightbridge investor slide deck which is available on our website. Our presentation illustrates the levelized cost of electricity from solar, wind, existing nuclear, natural gas and coal plant. And compares those cost with nuclear power generated using Lightbridge's 10% up rate metallic fuel. The conclusion is compelling. Incremental electricity generated using our 10% up rate fuel and a 24 month fuel cycle will cost less than that from power from natural gas or coal fired sources. Approximately $40 per megawatt hour, versus about $65 to $70 per megawatt hour for combined cycle technologies. Power from solar, wind and new build nuclear plants range from $100 to more than $250 per megawatt hour. And of course, there also is the issue of carbon emissions from fossil fuel. Emissions from nuclear power generation are essentially carbon free. We now have a better understanding of Fukushima. In addition to the earthquake and tsunami, human error contributed to the plant's destruction. In 2012, Japan started bringing other nuclear reactors back online because it's utility industry and caused billions of dollars of losses from importing fossil fuel to keep the lights on. And japan began to institute stronger nuclear safety programs and oversight. The economies of long term efficient base load and carbon free electricity from nuclear power are undeniable. According to the Nuclear Energy Agency, there are more nuclear reactors under construction now, than before the Fukushima accident. And hundreds more are planned to go into operation before 2035. There are approximately 437 active nuclear power reactors operating in 30 countries based on data compiled by the World Nuclear Association. That number is expected to grow steadily with more than 70 reactors, currently under construction around the world. China, Russia, and South Korea have 29, 10 and 5 reactors currently under construction respectively. In all, more than 150 new reactors are expected to be completed by the end of 2016 with another 330 proposals pending approval, mostly in China and India. In United States, 20 proposals for reactors are pending and four are planned in the United Kingdom. The Chez Republic, Poland, Slovakia, Romania, Ukraine, Finland and Sweden also have plans to build new reactors within the next decade. Suffice it to say, we believe Lightbridge is well positioned to serve as growing market with both next generation nuclear fuel and proven expert advisory services. Now, let`s open the call to your questions. Remember, in addition to asking live questions by telephone, you should submit questions in writing now, to ir@ltbridge.com. I'll turn it back to Gary Sharpe who is in charge of our investor relations to assemble the questions that have been sent in writing or to Bethany our operator on live questions from callers.
  • Gary Sharpe:
    There have been a few questions that have come in over the interest. First one, how much equity or capital or shares do you anticipate issuing if you go forward with the proposed capital raise that you mentioned in your remarks?
  • Seth Grae:
    Well we may or may not forward eventually with a capital raise. What we would be looking for between now and the end of the year is in the neighborhood of about $4million of extra cash in the company. We've got our only R&D expenditures, to commercialize the nuclear fuel technology. This is because the consulting division of the company is profitable at about 40% gross margin to the revenues from that division. So the new cash would be to commercializing the R&D technology. As I said in the remarks, there are three main categories for how we would arrange that approximately $4 million. One is we are working towards new consulting contract. If you say those are at about 40% gross margin overall, if we had $10 million in new consulting contracts this year that would provide the $4 million. We don’t know how those will work out, if we might get all or some of that $4 million, we'll know in the next few months due to consulting contracts. The second as I said is, transactions with one or more strategic partners, we began these discussions in 2012, they are ongoing. They could include cost sharing. They could include potentially forming some sort of JV entity that would take cost off our books for the R&D expenditures which is just as good as receiving money into us. Potentially they could include one or more of these large companies taking a small equity stake in Lightbridge and having an expiry shelf filing could help with that because large companies prefer to get registered stock If the combination of new consulting contract and the transactions with one or more strategic partners doesn't collectively meet the goal, then we could contemplate an equity raise which is something we are not working on right now. But that could be filling the gap there.
  • Gary Sharpe:
    Here is a follow-up question from (inaudible) Investor. What's changed in your thinking? Because earlier you had said that you don’t plan an equity raise and now there is a potential. And then this investor is also asking for updated guidance on consulting projects that we've mentioned in the past.
  • Seth Grae:
    We have been earning enough revenue through our consulting business before Fukushima that we clearly were not contemplating a raise. Now there are a lot of signs of the effective Fukushima are going behind us, the reactors are starting to be turned on in Japan. As I said, there are actually more reactors under construction and on order in plans now than the day before Fukushima around the world. In the United States there are reactors under construction which was not the case the day before Fukushima and countries that we had been working with Fukushima that went away that decided to put on hold their plans to look at nuclear power are now back. And that’s why we expect to know around the middle of this year on new consulting contracts. So when we look at that, the answer might be the things haven't changed. That there is enough consulting (inaudible) Fukushima and we don’t need to do a raise. What also has changed is that big companies in nuclear also pauses after Fukushima but now are back and engage in all this new growth and nuclear power and some of them might be entering into strategic arrangements with us, this year as well. So, don’t take it that I am saying we're doing an equity raise. I am saying, we're going seek about $4 million of new capital this year through a combination of new consulting contracts, work with major parties and strategic transaction and if there is a shortfall between those two, then we could look at other options that could include an equity raise, but we're not working on when now we may or may not get to that. And on the update on the consulting contract. As I said, parties that we were taking to before Fukushima are now back and engaged with us. Again in ways we think could lead to a contracts we have (inaudible) under their own schedules are supposed to hear back by about the middle of this year. The only country that’s not back, that we have talked to is Italy. We had been informed by Italy we would be the regulatory advisor, never got to a contract but have been told we were getting to the contract before Fukushima. They then had a referendum that canceled the nuclear power, so that one's not that, all the others are, plus the new ones. And even in Italy, we're now having some overtures that with the new government forming, there might even be possibility there in the future although not in the immediate term.
  • Gary Sharpe:
    There was a question, it was a two part question from the same investor. Can you give any updated guidance as to the consulting revenue projections that we've talked about today and in the past.
  • Seth Grae:
    I think the consulting in these last couple of quarters have been pretty flat and I think we have the confidence of at least that continuing out into the future with our contracts to renew and extend it until the end of 2014 in the UAE and under the terms of those contracts, the ability of the party is to continue extending those for a year or two at a time beyond that. The question will be the dealt on half of that with new contracts that we'll hear from in the middle of this year, we're dealing with very responsible governments, very responsible parties in those governments. I don’t think there will be much delay beyond the middle of this year. So, in around the June timeframe, we'll be able to give you a better answer on that but some of these contracts can be quite significant.
  • Operator:
    (Operator Instructions).
  • Gary Sharpe:
    Does it make sense to slow capital expenditures in R&D until consulting revenue might be high enough to fund R&D organically.
  • Seth Grae:
    If that’s a possibility, we're clearly not going to spend ourselves into oblivion. We control our spending. So what we would do is, our preference is because we haven't slowed the R&D program, is to continue it. Our preference is to bring n the revenue to continue it. If we need to slow anything, we can, but that’s not our plan. And I think $4 million among these multiple ways of getting the money including with new commercial contracts with consulting clients and with strategic partners is reasonable for us to achieve. And we have quite a bit of time. So, no, I don’t plan on doing that but that’s certainly something we could consider as well in addition to these three categories that we've talked about category and the money.
  • Operator:
    Our first question comes from the line of Marcus Perez with Great Western LLC. Your line is open.
  • Marcus Perez:
    I need to understand in chronological order here, exactly what the R&D is that the company has to do? My understanding is of course that you’ve been testing the fuel technology for the past several years, so, based on that, what further R&D needs to be done that’s going to require all these millions of dollars. I would think by now, with all the money that we spent that most of that fuel technology should be pretty much perfected. I mean this is what I am trying to get my mind wrapped around as to what further R&D needs to be done especially since it's my understanding that the manufacturers themselves are the ones that have to manufacture the fuel rod technology to sell it to the providers. So, if you could expand on that, I'd appreciate it.
  • Seth Grae:
    And I think those comments are right, Marcus. The 10-K that we filed has four bullets discussing those expenditures. One is demonstrating the full scale fabrication process of our metallic fuel rods. We demonstrated making meter long rides, we made three plus long meter rods, and we'll be doing that. The second is performing in-reactor and outer reactor experiments starting this year that we've talked about it, the advance test reactor which is partly paid for by the US government as well as the mere reactor in Russia. The third is developing analytical models in 2013 to 2016 for our metallic fuel technology that can be used for regulatory licensing purposes. And the fourth is beginning the lead test assembly operations in the commercial reactors which if used at that stage would be paid for by the commercial parties. Let me for a put a little more color on this. I'll ask Jim Malone our Chief Nuclear Fuel Development Officer to jump in here as well.
  • Jim Malone:
    Marcus that’s a good question and as I said, to capture the essence of it, but bringing a new fuel to market that some of our competitors are potential partners if you will have spent upwards of a $100 million trying to develop new fuel products and I have always been skeptical, I don’t know if you are aware that I have previously been (inaudible) responsible for fuels that have been in nuclear power plant. I think the Lightbridge estimates are somewhere around 30-35 million perhaps to get the fuel in place with a large portion of that being covered by our potential partners, is reasonable. The time is reasonable. We are looking to be able to complete our sample irradiation program by 2016. That will give us a wealth of information to support anything we need to do with respect to providing data to the nuclear regulatory commission, and also to tune if you will, the analytical model that are necessary to analyze the fuel from a point of view of (inaudible) and a thermal hydraulic performance, in other words how well it handles this transfer and how well it behaves in upset or off normal conditions inside the reactor. Getting through those pieces is key to getting the approval for a lead test assembly operation and I believe that we have a rational target for LTA operations in 2017-2018 and by the end of the second cycle of that irradiation, we believe that we'll have a clear opportunity to be talking with the utilities that are part of our nuclear utility fuel advisory board and each one of them to go ahead begin to order (inaudible) quantity of fuel from the fuel manufacturers that we are working with. I hope that I have clarified this for you.
  • Marcus Perez:
    Yes it does. One follow-up question if I can. You mentioned that in the worst case scenario that the United States with the sequester May not fund it well or whether it will or whether they don’t, Lightbridge is going to go ahead, has already made plans to have it tested in the mirror reactor in Russia. My question is, will the US assuming that, the tests are successful, will the US allow or recognize those positive tests and allow US reactors or companies to purchase the fuel based on those test results?
  • Jim Malone:
    Part of the plan if you will, the project plan to irradiate samples in the MIR reactor is a detailed procedure that gives a step by step guide to how to prepare the fuels, how to irradiate the fuels and how to examine the fuels post the radiation. We will do destructive and non-destructive examination of the fuel post irradiation. We'll actually do some destructive examination prior to irradiation to make sure that the samples are exactly what we expected them to be, that they do truly represent the fuel that will be manufactured commercially. and in that way and having the rigorous quality assured procedures, stably and solid, we believe the NRC will have no trouble accepting the data especially when we can show them the experimental results and the results that have used by the cancellation package and analytical models showing that they are in disagreements with the NRC focus and assurance that they need to go ahead and allow us to proceed with the LTA program.
  • Seth Grae:
    Yes, Marcus, I'll just add a couple quick points also on why we're confident the answer to that question is yes, and why that actually was our plan before the US government approved us adding the advance test reactor to the irradiation program we already had planned at that point at the MIR reactor in Russia. Why is that the Russian nuclear entities actually do sell nuclear fuel to pressurized water reactors in Europe, in major global pressurized water reactor markets already approved by major western regulators. The second thing is that Idaho National Laboratory itself which has the advance test reactor where we'll be doing testing, Idaho National at itself does radiation testing in the MIR reactor in Russia in addition to its own advance test reactor in Idaho. And the third is that, major western nuclear fuel companies like the US' Westinghouse do nuclear fuel testing in Russia and get NRC licenses based on the data we actually we involved in helping to introduce Westinghouse to (inaudible) institute in Moscow where they then started doing their own thermal hydraulic testing on their PWR fuels.
  • Marcus Perez:
    One last question if I can. Do you have any concern about China somehow getting a hold of the technology because China obviously is just a huge country that is expanding probably more rapidly than any other country in the world right now. And they have a history of taking technology and doing their own thing. How secure do you think our patents are going to be against China trying to take that technology and use it themselves without paying us royalty.
  • Seth Grae:
    Yes, China is a huge market for us Marcus and we have very strong patent protection through our patent corporation treaty filing in China and worldwide. China is not known for cheating on intellectual property in the nuclear power area. In fact, it’s a major priority of Chinese leadership to further enter international nuclear markets, to enter nuclear fuel, nuclear reactor manufacturing in China for export. They’ve been very clear about this. So all of a sudden, they are becoming big proponents around the world of protecting intellectual property rights and nuclear, they’ve identified this as a major export market for China. Westinghouse as you know is deploying two AP1000 reactors right now at the Sanmen site in China, two AP1000 reactors at the Haiyang site in China, it looks like they'll add two more of each of those sites plus others around China and they are working quite well with China on intellectual property rights in nuclear. But finally, I'll say that our plant has into China right now, and there are many. But the main nuclear fuel supplier into China right now is the Russian nuclear fuel entities. And by partnering with the Russian nuclear fuel entities and having them sell fuel into China is a major pass with us and the Russians tend to be pretty strong on protecting their contractual rights when they sell anywhere. So, those are good friends to have for that.
  • Operator:
    (Operator Instructions).
  • Gary Sharpe:
    There are some more questions have come in over the internet. This one segways off the question Seth just answered about China. The question says, does Lightbridge anticipate any additional consulting work from China or India given the large market for new build activities that these countries represent.
  • Seth Grae:
    Do you want to take that?
  • Gary Sharpe:
    The question is that, are there consulting opportunities in China or India for Lightbridge considering the size of the market.
  • Seth Grae:
    Well, the answer is not at this time, those are not countries where we have consulting proposals pending. Those are countries that have deployed and operated reactors and tend not to be the kind of countries looking for outside consulting. So, it could be in the future and especially as those programs get into phases that they haven't been in before, like the decommissioning of their older facilities they already have, like the regulatory regimes to oversee that type of work, but not today.
  • Gary Sharpe:
    Are there countries outside the US or Russia that Lightbridge could test its next generation fuel?
  • Seth Grae:
    Yes.
  • Jim Malone:
    Yes, the testing capabilities are very across the world. We like the MIR reactor because of its capabilities to be quite a typical PWR condition. However, if that were not available, there is the kind of low reactor in Korea, there are a couple of niche reactors operated by atomic energy Canada Limited as they (inaudible) laboratories, there is the (inaudible) reactor in Norway which is world famous for its capabilities to do the kind of work that we're looking at. The difference between this group and others is that the ones we're working with are relatively lower cost and the timing has also been our favor to deal with MIR and ATR. Dealing with the others, you get into a queue and you have to wait and then you have to wait also for the post irradiation examination. So it would be later progress and we're content right now with the facilities we have selected. However, if definitely we're to go along and we need something else, we have identified backup facilities.
  • Gary Sharpe:
    Here is a related question or another question I should say. It appears that Lightbridge fuel will be deployed commercially in 2022 and the patents expire between 2028 and 2030. That’s a short window of protection. Can you elaborate on how Lightbridge plans to protect the revenue stream from competition when or if patents expire?
  • Seth Grae:
    Well as you’ve heard on this call and previous calls, we keep having new patent filings that keep extending that quite out into the future and we intend to keep doing that as we move forward and get to our finalized design. So I don’t see that period overall shortening as a closing window. I think in fact that might actually be opening as we go forward in time. I'm going to ask Andrey Mushakov to step in on this as well.
  • Andrey Mushakov:
    I would like to answer is the fact, the idea we need to partner with fuel fabricator and the utility because the fuel fabricator and the utility in the United States will have to basically work together on a license and package for regulatory approval of the lead test assembly demonstration program. (Inaudible) fuel render would keep fabricate our release test assemblies and the utility will have to put those sleep assemblies into one of its hybrid commercial nuclear power plants. So, our current plan is to seek partnership arrangements with a fuel fabricator in the near term over the next two to three years and so those partnerships, our plan is to establish and secure some sort of a approach sharing arrangement or some other arrangement whereby Lightbridge's long term interest will be protected through either (inaudible) or some other sort of partnership arrangement for the fuel render irrespective of when our fuel comes online and becomes commercially available for sales nuclear power plant.
  • Gary Sharpe:
    Let me circle back now to another question from an investor on the issue of joint ventures. The question is, are there any joint ventures that you're currently exploring?
  • Seth Grae:
    Yes, we are. Let me again turn that over to Andrey Mushakov just to give a general comment because these are highly confidential discussions.
  • Andrey Mushakov:
    As was mentioned in the past, last year basically, we began discussions with fuel fabrication partners with fabrication demonstration for our metallic fuel technology in United States. So those discussions are still ongoing. Those are confidential discussions bond by among disclosure agreements. So we can't disclose in detail (inaudible) what the discussions are all about but, we do believe that we should be able to complete those discussions later this year and (inaudible) will be able to make public announcements, any potential arrangements that might come out of those discussions.
  • Gary Sharpe:
    All right ladies and gentlemen, that appears to be the last question over the internet that we've gotten. Bethany?
  • Operator:
    At this time, I am showing no other phone questions as well. So this does conclude the conference for today. I would like to turn the call back over to Gary for any closing statements.
  • Gary Sharpe:
    Well here is Seth Grae with a few closing remarks.
  • Seth Grae:
    Well thank you again. As I said before and this bears repeating, momentum is building globally throughout the commercial nuclear power market. And Lightbridge is well positioned to serve this growth with a next generation fuel design and expert advisory services. At Lightbridge we're working here every day to translate that opportunity into shareholder value. If we can elaborate on any aspect of Lightbridge's operations, financial performance or strategic direction, our lines are always open at ir@ltbridge.com or telephone 571-730-1234. Until our next quarterly business update, thank you for your continuing support. Good bye.