Micron Technology, Inc.
Peak current reduction using dynamic clocking during charge pump recovery period

Last updated:

Abstract:

A system includes a charge pump to charge wordlines of a memory array, a pump regulator coupled including a level detector, and dynamic clock logic coupled between the level detector and an oscillator. The logic provides clock signals to the charge pump and is to perform operations including: detecting that the charge pump has entered a recovery period; causing the oscillator to output, to the charge pump during a first time period of the recovery period, a first clock signal comprising a lower frequency than output during a time period preceding the recovery period; detecting that a voltage level from the level detector satisfies a trip point criterion; and causing the oscillator to output, to the charge pump during a second time period of the recovery period and responsive to the detecting, a second clock signal comprising a higher frequency than output during the time period preceding the recovery period.

Status:
Grant
Type:

Utility

Filling date:

7 Apr 2021

Issue date:

13 Sep 2022