Oracle Corporation
OVERLAPPING-IN-TIME EXECUTION OF LOAD TESTS ON APPLICATIONS IN A CENTRALIZED SYSTEM
Last updated:
Abstract:
Application testing using non-emulated operating system assistance without rebooting a hardware host is provided. A user specified build job for executing the application based on a load test is received. The hardware host is selected from a pool of hardware hosts. The hardware host is configured based on the user specified build job to provide the non-emulated operating system assistance while executing the application based on the load test. The application is executed based on the load test including communications between a client and servers while using the non-emulated operating system assistance. The hardware host is returned to the pool of hardware hosts. The hardware host is available upon the returning for use of subsequent load tests without rebooting the hardware host.
Utility
24 Feb 2021
17 Jun 2021