Oracle Corporation
System and method for coordinated link up handling following switch reset in a high performance computing network

Last updated:

Abstract:

Systems and methods for supporting coordinated link up handling following a switch reset in a high performance computing environment. Systems and methods can ensure that when a switch of a fabric is rebooted, HCA ports connected to that switch will be set in Active state at the same time even though link training times for different ports may vary with up to several seconds.

Status:
Grant
Type:

Utility

Filling date:

6 Jan 2020

Issue date:

1 Mar 2022