Parker-Hannifin Corporation
Boom potential energy recovery of hydraulic excavator

Last updated:

Abstract:

A hydraulic system for recovering potential energy of a load implement of a mobile construction vehicle. The hydraulic system includes first and second actuators and control valving. The first and second actuators are configured to be coupled to the load implement for controlling raising and lowering of the load element. The control valving is operable between a first position at which, during a lowering of the load implement, the control valving directs hydraulic fluid from one of the first and second actuators to an accumulator to charge the accumulator, and a second position at which the control valving directs hydraulic fluid from the accumulator to one or more of the first and second actuators to power the one or more of the first and second actuators to raise the load element.

Status:
Grant
Type:

Utility

Filling date:

28 Jan 2021

Issue date:

18 Jan 2022