QUALCOMM Incorporated
DYNAMIC POWER CONTROL FOR PRIORITY BASED TRAFFIC

Last updated:

Abstract:

Various aspects of the present disclosure generally relate to wireless communication. In some aspects, a user equipment (UE) may determine a deadline prior to a first uplink transmission associated with a secondary cell group (SCG), wherein the first uplink transmission is associated with a first priority level; determine whether to perform a second uplink transmission associated with a master cell group (MCG), wherein the second uplink transmission is initiated after the deadline, and wherein the second uplink transmission is associated with a second priority level; and adjust a transmit power of the first uplink transmission based at least in part on at least one of: determining whether to perform the second uplink transmission, or the first priority level and the second priority level. Numerous other aspects are provided.

Status:
Application
Type:

Utility

Filling date:

2 Feb 2021

Issue date:

19 Aug 2021