QUALCOMM Incorporated
CROSS-CARRIER DOWNLINK CONTROL INFORMATION SCHEDULING
Last updated:
Abstract:
In cross-carrier scheduling of DCIs on a data channel, a base station may transmit a first DCI on a first radio frequency (RF) carrier, where the first DCI schedules a data channel of a second RF carrier (and optionally indicates that the base station will transmit at least one DCI on the data channel of the second RF carrier). In some examples, the base station may transmit the first DCI in a control channel of the first RF carrier. In some examples, the base station may transmit the first DCI in a data channel of the first RF carrier. In some examples, the base station may transmit, in a data channel of the second RF carrier, a second DCI that indicates that the base station will transmit at least one DCI in the data channel of the first RF carrier.
Utility
22 Apr 2021
28 Oct 2021