QUALCOMM Incorporated
TRANSMISSION POWER CONTROL COMMAND ACCUMULATION FOR NR-DUAL CONNECTIVITY
Last updated:
Abstract:
A configuration to enable a UE to discard a TPC command for the MCG if there is an overlapping SCG transmission. The apparatus determines that a first PUSCH transmission to an SCG is scheduled to be at least partially concurrent in time with a second PUSCH transmission to a MCG. The apparatus determines whether to receive a TPC command associated with the transmission of the second PUSCH. The apparatus determines whether to discard the TPC command based on when the TPC command is received.
Status:
Application
Type:
Utility
Filling date:
17 Mar 2021
Issue date:
28 Oct 2021