QUALCOMM Incorporated
RESCHEDULING IN INTEGRATED ACCESS FRONTHAUL NETWORKS
Last updated:
Abstract:
Disclosed are techniques for wireless communication. In an aspect, a relay/repeater unit (RU) in an integrated access/fronthaul (IAF) network, receives, from an upstream node, a first physical downlink control channel (PDCCH) message associated with a scheduled physical uplink control or shared channel (PUXCH) transmission from a downstream node at a scheduled time, and relays or repeats the first PDCCH message to the downstream node. If the scheduled PUXCH transmission associated with the first PDCCH message is not received from the downstream node at the scheduled time, the RU sends a negative acknowledgement (NACK) message associated with the scheduled PUXCH transmission to the upstream node. The RU may also or alternatively generate a second PDCCH message associated with a rescheduled PUXCH transmission and send the second PDCCH message to the downstream node.
Utility
10 Feb 2021
11 Aug 2022