QUALCOMM Incorporated
SHARED REQUIREMENT FOR A DOUBLE DIFFERENTIAL TIMING PROCEDURE

Last updated:

Abstract:

In an aspect, a position estimation entity (e.g., LMF) determines at least one shared requirement (e.g., a timing requirement, an RF chain requirement, etc.) for both of a first differential timing (DT) procedure of a double differential timing (DDT) procedure (e.g., TDOA-based or RTT-based) and a second DT procedure of the DDT procedure, the first DT procedure based on timing measurements between a target user equipment (UE) and first and second wireless nodes, and the second DT procedure based on timing measurements between a reference wireless node and the first and second wireless nodes, and transmits, to at least the target UE and the reference wireless node, requests to perform the DDT procedure along with an indication of the at least one shared requirement for the DDT procedure.

Status:
Application
Type:

Utility

Filling date:

3 Mar 2021

Issue date:

8 Sep 2022