Snowflake Inc.
Automated generation of dependency graph based on input and output requirements of information
Last updated:
Abstract:
A system and method for automatically generating a dependency graph based on input and output requirements of information. The method includes obtaining, by a processing device, a list of a plurality of modules executing on one or more processing devices, the plurality of modules associated with a plurality of input requirements and a plurality of output requirements. Each module is configured to generate an output dataset of a respective output requirement of the plurality of output requirements based on an input dataset of a respective input requirement of the plurality of input requirements. The method includes determining, by the processing device, an execution order of the plurality of modules based on the plurality of input requirements and the plurality of output requirements. The method includes establishing, by the processing device, a plurality of connections between the plurality of modules based on the execution order.
Utility
29 Oct 2021
19 Apr 2022