The Toronto-Dominion Bank
Systems and methods for monitoring construction projects
Last updated:
Abstract:
A system includes devices and sensors associated with a construction site for a project. A computing apparatus, communicates with the devices and the sensors, includes a storage device and a processor. The storage device stores software instructions for controlling the processor that when executed by the processor configures the processor to obtain a predetermined construction schedule with terms for the project. The processor obtains sets of data that each corresponds to a different term. The processor generates a distributed listing for the project, which includes a sequence of a plurality of units corresponding to different terms and sets of data. The processor receives a signal from one of the sensors, wherein the signal is representative of a progress event. The processor identifies whether the progress event at the site corresponds to one of the terms in the schedule and updates and saves the distributed listing when a correspondence is identified.
Utility
11 Aug 2016
21 Jan 2020