Trimble Inc.
AUTONOMOUS SOIL MOISTURE CONTROL
Last updated:
Abstract:
Embodiments describe a method for moisturizing soil at an open construction site. The method includes determining current site characteristics of the open construction site; storing the current site characteristics in memory; determining a target volume of water for achieving a target soil moisture level based on the current site characteristics of the open construction site; calculating a target water application rate to achieve the target soil moisture level across the open construction site; determining a planned path across the open construction site; and guiding a water truck along the planned path while dispensing the target volume of water at the target application rate to achieve the target moisture level in the soil at the open construction site.
Utility
10 Apr 2019
15 Oct 2020