VMware, Inc.
Top-of-rack switch replacement for hyper-converged infrastructure computing environments

Last updated:

Abstract:

Disclosed are various examples for top-of-rack (TOR) switch replacement in hyper-converged computing environments. A bring-up network configuration is applied to a network switch to install the network switch in a rack. An active workload within the rack is analyzed to identify a workload network configuration for the active workload. The active workload is reassigned to the network switch from a faulty network switch. The network switch is configured based on the workload network configuration for the active workload.

Status:
Grant
Type:

Utility

Filling date:

30 Oct 2019

Issue date:

23 Nov 2021