VMware, Inc.
I/O destaging bandwidth control

Last updated:

Abstract:

Destaging data from a first tier data store to a second tier data store can be performed periodically and concurrently while processing user I/O operations. Each round of destaging can be delayed by certain amount (sleep time). A throttling factor can be used to compute the sleep time as a fraction of a base sleep time. The throttling factor can vary based on the usage level of first tier data store, and can be used to determine the destage frequency.

Status:
Grant
Type:

Utility

Filling date:

26 Jun 2019

Issue date:

29 Dec 2020